Forum Discussion

mulemystikker's avatar
mulemystikker
Seasoned Newcomer
1 month ago

Frosty Tunnel Bug

Hi,

Anybody else have the same issue with tunnel in Frosty Fjords? Deleting and rebuilding rr does not seem to fix it.

 

5 Replies

  • duderville's avatar
    duderville
    Rising Vanguard
    1 month ago

    It might be that the track can't make that sharp 90° bend. You might have to move some houses and move the track away from the mountain a bit before it will let you connect to the tunnel. Mine works, but the track is coming straight in rather than turning into the tunnel.

     

  • m652i346ez0m's avatar
    m652i346ez0m
    Seasoned Ace
    1 month ago

    This is how your tracks should be done in Frosty Fjords and you won’t have a problem, at least I don’t think u will 😊

  • mulemystikker's avatar
    mulemystikker
    Seasoned Newcomer
    1 month ago

    Hi,

    thanks for the feedback, but up until this new season there was no problem with the tunnel or railway.

  • duderville's avatar
    duderville
    Rising Vanguard
    27 days ago

    I believe that. EA seems to be adding new bugs. Were you able to rearrange the track to solve the problem?

  • Have same issue with tunnel and the bridge connections.  Not able to link them after a small rearrange of buildings.  Now stuck with no connections anywhere and even removing all track etc same issue.   Didn't have issues before when a first placed them when mass transit was introduced.  More bugs on perfectly working stuff.