Forum Discussion
suzses
10 years agoSeasoned Ace
Stage eight: The living area expands some more. The builder is obsessed with fixing the chimney and thinks the living areas are still too small. But baby number three (and hopefully only number three) needs a place for his crib . . . oh well, next time.
The end result on the inside is seen here (we have musical instruments now and an owl :) )

On the outside, a proper chimney, a new front door and larger porch area

A few new things in the backyard: A pavilion with birdbath and tree house

It was time to redo the roofs. Overall better, but the pretty gable won't fit any spot now :( (It was on the front before, but I thought maybe I could at least get it on a side or the back, but nooo.)




(Edited because I always see SOMETHING that needs fixed - what's "mustical" lol.)
The end result on the inside is seen here (we have musical instruments now and an owl :) )

On the outside, a proper chimney, a new front door and larger porch area

A few new things in the backyard: A pavilion with birdbath and tree house

It was time to redo the roofs. Overall better, but the pretty gable won't fit any spot now :( (It was on the front before, but I thought maybe I could at least get it on a side or the back, but nooo.)




(Edited because I always see SOMETHING that needs fixed - what's "mustical" lol.)