Well, reaching the level cap at level 80 is going to take some time to finish. @gamerdruid, does the PTE have any plans to hasten the speed of command point generation and package production? I would suggest cutting 6 hours of package production per world to 4 hours and same goes with command point generation. Instead of 6 minutes per command point, it should be 4 minutes.
Anyways, this is just a suggestion, it might take ages to bring two or more bases to level 80 or higher, that is unless the wait time for all types of production is reduced.