Forum Discussion
- RosshkNew SpectatorI'm just placing all my tracks at the bottom until I have all the track pieces. I can't build something if I don't know how many parts I'll have.
Since Halloween will start right after this, I'll probably just end up storing everything, like I did w/ all the Clash of Clones walls (wish I never did go back and build). - Is it possible to place the tracks so that the pillars are not on the sidewalk and still overpass the road without having a pillar in the road? Or worse case a pillar in the middle of the road (turn lane middle) and none on the sidewalks to overpass the road?
- I intend to nuke my secondary town when this event is over. I have decided I like the grid pattern. So I'm doing that in that town and SH in my main town
I like how my town has grown organically in my main town. I'll do some redesigning once I have Barney's. I have a plan for a sports/fun area - It is really hard to integrate! I agree. :)
At the moment my stations are way too close to eachother, the thing is, we don't know yet with how many rails we'll end up with in the end.
I would really like to have the Monorail all around my town. But I don't think we'll get enough rails for that. So for now I'm just adding up the rails and I'll have to move the stations around once I know where it will end. Raven_Darkstorm wrote:
Is it possible to place the tracks so that the pillars are not on the sidewalk and still overpass the road without having a pillar in the road? Or worse case a pillar in the middle of the road (turn lane middle) and none on the sidewalks to overpass the road?
I don't know why you're worried about this. It's not like we can put cars on the road. :(- I have my houses surrounded by my castle walls and the track going around the walls. I just hope to get enough track to go all the way around. The monorail is complementing my town so beautifully. Moving buildings one piece at a time works for me.
- I had intended to nuke my town once this event was over....I hadn't even crossed my mind Halloween was right behind it. :cry:
Maybe since the kids are back in school I can nuke on a Monday and just ignore the house work for a few afternoons and get everything rebuilt before Halloween starts :lol: moarku wrote:
nicolknappen wrote:
As someone who is kind of right wing about having a polished design, this is hard to take... :)
I had no idea political preferences affected choices in design. :shock:
I'm took my cue from John Waters' remark that he's very right wing about no white shoes after Labor Day (re Serial Mom). :)joniferous wrote:
My thinking is that the monorail in Springfield broke anyway so I might just have one or two random bits of track there but SH would have been able to fix it and get a good conductor because they're super rich!
I love the idea of random bits of track left, but I know I won't have the discipline to do that. I'll use every curvy piece of track I can get... :)wadebear wrote:
I'm hoping they let us move the monorail to Krustyland. It would fit in much better (most large theme parks have a people mover system) and I have SO MUCH empty space available there...
This would be awesome!!
I really had no idea what to do so I just had my Tetanus Terminal circling the prison
My main terminal though I'm going to think up something more substantial, more than likely would be up in Springfield heights
About The Simpsons Tapped Out General Discussion
Talk about your The Simpsons: Tapped Out experience with other TSTO players.49,416 PostsLatest Activity: 12 hours ago
Related Posts
Recent Discussions
- 5 days ago
- 13 days ago
- 21 days ago
- 22 days ago
- 22 days ago